Laminate flooring boards must be acclimatized for 48 hours in the room where they will be installed. Installation should take place at room temperature of at least 65°F (15°C). A floor surface temperature of 59°F and an overall room temperature of 64°F must be ensured before, during and three days after the installation.
Read more »